March 2019
- Design and installation of 2 guages set to AHD heights in two drain locations near a wastewater treatment plant in Waroona
- GPS survey from control – PCG94 & AHD
- Setting out AHD height and adjusting surveyors “E” staff to set AHD level
- Plan of locations and report of methodology to client (environmental company)