April 2019
- Control survey, locate existing infrastructure and place TBMs
- Calculations for bulk earthworks, pad and grid set-out
- Earthworks set-out, architectural grid set-out and plans
- Structural calculations for footings and bolt set-out of column cages
- Multiple visits to set-out grids, puddling in steel cages during 3 concrete pours as well as setting and checking cages pre and post pour
- Set-out of wet areas and slab-lines