LAND PROPERTY DEVELOPMENT (LPD) Surveys – Client Information Portal

ABOUT

LPD Surveys encourages an open & positive learning/teaching environment for staff within the business and want to share this information with our clients.

We want every project to be a success and seek for the information below to better inform our existing and future clients of the process, timing and cost of their projects.

 

Disclaimer

The information contained on this website has been prepared by LPD Surveys solely as a guide and does not constitute advice. LPD Surveys have made every effort to ensure the content published on this website and documents is current and accurate at the time of publishing. Changes in circumstances after the date of publication may impact on the accuracy and currency of the information contained on this website and published documents. LPD Surveys reserves the right to change the content of this website and its published documents at any time. LPD Surveys are not liable for or take responsibility for any direct or indirect loss, damage, cost or expenses suffered through the use of reliance upon anything contained or omitted from the information on this website or published documents.

 

BUSINESS REGISTRATION & INSURANCES 

ASIC-ACN-Certificate

Certificate of Insurance – Motor (30 mil)

Certificate of Insurance – Professional Indemnity (2 mil)

Certificate of Insurance – Public and Products Liability (10 mil)

Certificate of Insurance – Worker Comp (50 mil)

 

OCCUPATIONAL HEALTH & SAFETY (OHS) and QUALITY ASSURANCE DOCUMENTS

Available upon request – soon to be uploaded.

 

FREEHOLD LAND – BOUNDARY ENCROACHMENTS, ADVERSE POSSESSION, DIVIDING FENCES & RETAINING WALLS

Boundary Encroachments
Typically there is a +/-50mm tolerance for permanent improvements (building, column, fence, wall, shed) along boundary lines.
You will need an identification survey (boundary re-peg survey & plan without the pegging) to confirm from a licensed surveyor that an encroachment exists and by how much.
If the encroachment is deemed significant, not over crown land or dedicated roads/laneways and an adverse possession claim (detail below) is not applicable typically the registered proprietor can:

  1. Remove the structure completely
  2. Partially remove the encroaching part of the structure/improvement and provide proof (Identification survey & plan)
  3. Acceptance by Easement – both registered proprietors will have to agree to have a “Right of access” easement over the encroaching improvement. An interest only plan is drafted and is to be lodged at Landgate (with a licensed surveyors fieldbook). Other costs are landgate plan lodgement fee, settlement agent fee and lawyer fees to provide the easement document.
    If the structure needs to meet the Building Code, a building surveyor will need to confirm that the struture has current approvals and meets the current building code regulations.
  4. Re-align the dividing boundary so the encroachment no longer exists. This is a 2 lot into 2 subdivsion process and typically only requires a survey plan to be lodged at landgate with minimal to no conditions.
  5. Accept the boundary encroachment – both parties are provided a copy of the identification plan and sign statutory declarations they are aware and accept the encroachment and will inform any future buyers of the property of the encroachment.
  6. Ignore the encroachment and let someone else worry about it another day – NOT recommended. If 20 years goes by an adverse possession claim could be made and other issues can arise if the problem is not dealt with.

Adverse Possession – Adverse Possession – Landgate 24Feb17

Dividing Fences – see http://www.fencingonline.com.au/disputes/western-australia.htm

Retaining Walls – see below links for information

https://www.mbawa.com/retaining-walls-on-boundaries/ 

http://www.bayswater.wa.gov.au/cproot/1796/2/Retaining%20wall%20information%20sheet%20-%20December%202015.pdf

 

FREEHOLD LAND – BOUNDARY ENCROACHMENTS, ADVERSE POSSESSION, DIVIDING FENCES & RETAINING WALLS

Boundary Encroachments
Typically there is a +/-50mm tolerance for permanent improvements (building, column, fence, wall, shed) along boundary lines.