April 2020
- 6 month construction project for 25 bed aged care facility – Nov 2019 to April 2020
- Cadastral boundary re-establishment survey
- Construction survey control
- Building and design tie-ins to cross-check design drawings
- Collation and QA of all design documentation – checks on digital data to set-out
- Multiple visits to set-out using high precision total stations
- Hydraulic, Structural, Architectural and Electrical set-out
- As-con of constructed structures and services for documentation and record