Project Description

April 2019

 

  • Control survey, locate existing infrastructure and place TBMs
  • Calculations for bulk earthworks, pad and grid set-out
  • Earthworks set-out, architectural grid set-out and plans
  • Structural calculations for footings and bolt set-out of column cages
  • Multiple visits to set-out grids, puddling in steel cages during 3 concrete pours as well as setting and checking cages pre and post pour
  • Set-out of wet areas and slab-lines